Mudd Loading Dock Closure for Structural Repairs 16-18 March
The Mudd loading dock is scheduled to be closed 16-18 March, possibly until 20 March, for structural repairs of the floor slab. During this time Carleton Laboratory will not be able to accept any deliveries of oversize dimensions and weight.
All Tech Air gas deliveries will also be halted during this time. Please plan ahead if you use compressed gases.
