Feniosky Peña–Mora


School of Engineering & Applied Science
Columbia University, 510 Mudd
New York, NY 10027
212-854-6574
feniosky@columbia.edu
top
 

 

 
84
1.
Golparvar-Fard M., Savarese S., and Peña-Mora F. (2010), “Model-based Detection of Progress using D4AR – A 4 Dimensional Augmented Reality – Models Generated by Daily Site Photologs and Building Information Models,” The International Conference on Computing in Civil and Building Engineering (ICCCBE), and XVII European Group for Intelligent Computing in Engineering (EG-ICE) Workshop, Nottingham, UK, June 30-July 2, 2010 (Abstract Accepted).
2.
Golparvar-Fard M., Thomas J., Peña-Mora F., and Savarese S. (2010), “Remote Assessment of Pre and Post-disaster Critical Physical Infrastructures using Segway Mobile Workstation Chariot and D4AR – A 4 Dimensional Augmented Reality – Models,” The International Conference on Computing in Civil and Building Engineering (ICCCBE), and XVII European Group for Intelligent Computing in Engineering (EG-ICE) Workshop, Nottingham, UK, June 30-July 2, 2010 (Abstract Accepted).
3.
Chen, A. Y., and Peña-Mora, F. (2010), "Automation for Construction Equipment Request and Deployment for Emergency Response," The International Conference on Computing in Civil and Building Engineering (ICCCBE), and XVII European Group for Intelligent Computing in Engineering (EG-ICE) Workshop, Nottingham, UK, June 30-July 2, 2010 (Abstract Accepted).
4.
Han S., Lee, S., and Peña-Mora, F. (2010), "Framework for a Resilience System in Safety Management: A Simulation and Visualization Approach,"  The International Conference on Computing in Civil and Building Engineering (ICCCBE), and XVII European Group for Intelligent Computing in Engineering (EG-ICE) Workshop, Nottingham, UK, June 30-July 2, 2010 (Abstract Accepted).
5.
Golparvar-Fard M., Peña-Mora F., and Savarese S. (2010), “D4AR – A 4 Dimensional Augmented Reality - Tools for Automated Remote Progress Tracking and Support of Decision-enabling Tasks in the AEC/FM Industry,”  6th International Conference on Innovation in Architecture, Engineering and Construction (ACE), State College, Pennsylvania, USA, June 9-11, 2010 (Abstract Accepted).
6.
Chen, A. Y., and Peña-Mora, F. (2010), "A Learning Pattern Inspired by Honeybees’ Foraging Behavior for Equipment Distribution in Civil Engineering Disaster Response," 6th International Conference on Innovation in Architecture, Engineering and Construction (ACE), State College, Pennsylvania, USA, June 9-11, 2010 (Abstract Accepted).
7.
Shiftehfar R., Golparvar-Fard M., Peña-Mora F., Karahalios K., and Aziz Z. (2010), “Application of Visualization for Construction Emission Monitoring,” Innovation for Reshaping Construction Practice, Construction Research Congress, Banff Alberta, Canada, May 8-11, 2010.
8.
Golparvar-Fard M., Savarese S., and Peña-Mora F. (2010), “Automated Model Component-based Recognition of Progress using Daily Construction Photographs and 4D IFC-based Models,” Innovation for Reshaping Construction Practice, Construction Research Congress, Banff Alberta, Canada, May 8-11, 2010.
9.
Chen, A. Y., and Peña-Mora, F. (2010), "A GIS Approach to Construction Equipment Request and Deployment during Emergency Response," Innovation for Reshaping Construction Practice, Construction Research Congress, Banff Alberta, Canada, May 8-11, 2010.
10.
Han S., Lee, S., and Peña-Mora F. (2010), "System Dynamics Modeling of Safety Culture based on Resilience Engineering," Innovation for Reshaping Construction Practice, Construction Research Congress, Banff Alberta, Canada, May 8-11, 2010.
11.
Chen, A. Y., Peña-Mora, F., Mehta, S. J., Plans, A. P., Brauer, B. R., Foltz, S., and Nacheman, S. (2010), "A GIS Approach to Equipment Allocation for Structural Stabilization and Civilian Rescue," 7th International Conference on Information Systems for Crisis Response and Management (ISCRAM), Seattle, Washington USA, May 2-5, 2010.
12.
Menassa, C., and Peña-Mora, F., "Real Options and System Dynamics Approach to Model Value of Implementing a Project Specific Dispute Resolution Process in Construction Projects," Winter Simulation Conference (WSC), Austin, Texas, USA, December 13-16, 2009.
13.
Golparvar-Fard, M., Peña-Mora, F., and Savarese, S., “Monitoring of Construction Performance Using Daily Progress Photograph Logs and 4D As-Planned Models,” ASCE International Workshop on Computing in Civil Engineering, Austin, Texas, USA, June 24-27, 2009.
14.
Golparvar-Fard, M., Peña-Mora, F., and Savarese S., “Sparse Reconstruction and Geo-Registration of Daily Site Photographs for Representation of As-Built Construction Scene and Automatic Construction Progress Data Collection,” ASCE International Symposium on Automation and Robotics in Construction, Austin, Texas, USA, June 24-27,2009.
15.
Han, S., Peña-Mora, F., Golparvar-Fard, M., and Roh, S., “Application of a Visualization Technique for Safety Management,” ASCE International Workshop on Computing in Civil Engineering, Austin, Texas, USA, June 24-27, 2009.
16.
Chen, A. Y., and Peña-Mora, F., “Collaborative GIS for Request of Construction Equipment in Disaster Response,” ASCE International Workshop on Computing in Civil Engineering, Austin, Texas, USA, June 24-27, 2009.
17.
Song, X., Peña-Mora, F., Arboleda, C., Conger, R., and Menassa, C., “The Potential Use of Insurance as a Risk Management Tool for ADR Implementation in Construction Disputes,” ASCE International Workshop on Computing in Civil Engineering, Austin, Texas, USA, June 24-27, 2009.
18.
Menassa, C., and Peña-Mora, F., "A Financial Engineering Framework to Estimate Value of Investments in Alternative Dispute Resolution Techniques in Architecture, Engineering and Construction Projects," NSF Civil, mechanical and Manufacturing Innovation (CMMI) Research Conference, Honoluu, Hawaii, USA, June 22-25, 2009
19.

Roh, S., and Peña-Mora, F., “3D Walk-through Environmental Model for Visualization of Interior Construction Progress Monitoring," The 3rd International Conference on Construction Engineering and Management (ICCEM) and the 6th International Conference on Construction Project Management (ICCPM), Jeju, Korea, May 27-30, 2009.

20.

Roh, S., Peña-Mora, F., Golparvar-Fard, M., and Han, S., “Visualization Application for Interior Progress Monitoring in 3D Environment," 2009 Construction Research Congress (CRC), Seattle, Washington, April 5-7, 2009.

21.

Golparvar-Fard, M., Savarese, S., and Peña-Mora, F., “Interactive Visual Construction Progress Monitoring with D4AR (4D Augmented Reality) Model," 2009 Construction Research Congress (CRC), Seattle, Washington, April 5-7, 2009.

22.

Menassa, C., and Peña Mora, F., “An Investigation of Real Option Theory to Evaluate Design, Procurement and Construction of Renewable Energy Facilities,” 2009 Construction Research Congress (CRC), Seattle, Washington, April 5-7, 2009.

23.
Song, X., Menassa, C., Peña Mora, F. and Conger, R., “Applying Insurance Pricing Models for Pricing Alternative Dispute Resolution as an Insurance Product,” 2009 Construction Research Congress (CRC), Seattle, Washington, April 5-7, 2009.
24.
Peña–Mora F., Ahn C., Golparvar-Fard M., Hajibabai L., Shiftehfar S., An S., Aziz Z., and Song, S. H. (2009), “A Framework for Managing Emissions during Construction,” International Conference and Workshop on Sustainable Green Building Design And Construction, National Science Foundation.
25.

Han, S., and Peña-Mora, F., “Context-Aware Project Dice Game: Incorporating Management Recovery Actions to Minimize Variation in Construction Performance,” 2008 International Conference on Computing in Civil and Building Engineering, Beijing, October 16-18, 2008.

26.

Menassa, C., and Peña Mora, F., “A Decision Support System Based on Financial Real Option Theory to Analyze Dispute Resolution Investments In AEC Projects,” 12th International Conference on Computing in Civil and Building Engineering, Beijing, China, October 16-18, 2008.

27.

Chen, A. Y., Peña-Mora, F., Ouyang, Y., and Aziz, Z. “Resource Allocation Using Collaborative GIS to Support Civil Engineering Emergency Response Operations,” 12th International Conference on Computing in Civil and Building Engineering, 2008 International Conference on Information Technology in Construction, ICCCB-XII, Beijing, China, October, 16-18, 2008.

28.

Han, S., Lee, S., and Peña-Mora, F., “Modeling the Dynamics of Non-Value Adding Activities due to Errors and Changes in Design and Construction Projects,” 12th International Conference on Computing in Civil and Building Engineering & 2008 International Conference on Information Technology in Construction, ASCE, Beijing, China, October 16-18, 2008.

29.

Han, S., Lee, S., Golparvar Fard, M., and Peña-Mora, F., “Modeling and Representation of Non-Value Adding Activities due to Errors and Changes in Design and Construction Projects,” 2007 Winter Simulation Conference, IEEE, Washington, D.C. December 9-12, 2007.

30.
Chen, A. Y., Tsai, M.-H., Lantz, T., Kaushik, N., Lakhera, S., Plans, A. P., Mathur, S., and Peña-Mora, F., “SERMAN: A collaborative framework for Supporting Emergency Response with Mobile Ad-Hoc Networks,” ASCE International Workshop on Computing in Civil Engineering, Pittsburgh, PA, USA, July, 25-28, 2007.
31.
Tsai, M.-H., Liu, L. Y., and Peña-Mora, F., “A Building Black Box for Urban Disaster Response and Relief,” ASCE International Workshop on Computing in Civil Engineering, Pittsburgh, PA, USA, July, 25-28, 2007.
32.
Han, S., Peña-Mora, F., Lee, S., and Park, M., "A Hybrid Simulation Modeling Approach for Non-Value Adding Iterations Management," ASCE International Workshop on Computing in Civil Engineering, Pittsburgh, PA, USA, July, 25-28, 2007.
33.
Lee, S., and Peña-Mora, F., "Hybrid System Dynamics and Discrete Event Simulation for Construction Management," ASCE International Workshop on Computing in Civil Engineering, Pittsburgh, PA, USA, July, 25-28, 2007.
34.
Golparvar Fard, M., and Peña-Mora, F., “Applircation of Visualization Techniques for Progress Monitoring,” ASCE International Workshop on Computing in Civil Engineering, Pittsburgh, PA, USA, July, 25-28, 2007.
35.
Lee, S., Peña-Mora, F., Helmes, P., and Fulenwider, M., “Theoretical Framework for Dynamic Project Management,” Construction Management and Economics 25th Anniversary Conference, University of Reading, United Kingdom, July, 16-1,8 2007.
36.
Golparvar Fard, M., Sridharan, A., Lee, S., and Peña-Mora, F., “Visual Representation of Construction Progress Monitoring Metrics on Time-Lapse Photographs,” Construction Management and Economics 25th Anniversary Conference, University of Reading, United Kingdom, July, 16-18, 2007.
37
Menassa, C,. and Peña Mora, F., “An Option Based Dynamic Optimization Model To Evaluate ADR Investments In AEC Construction Projects,” Construction Management and Economics 25th Anniversary Conference, University of Reading, United Kingdom, July, 16-18, 2007.
38.
Tsai, M.-H., Liu, L. Y., and Pena-Mora, F., “A Building Black Box for Supporting Disaster Response and Recovery,” 2007 ASCE Construction Research Congress, Grand Bahamas Island, May, 6-8, 2007.
39.
Han, S., Peña-Mora, F., Lee, S., and Park, M., "Strategic-Operational Project Management for Managing Non-Value Adding Iterations," 2007 ASCE Construction Research Congress, Grand Bahamas Island, May, 6-8, 2007.
40.
Bhagnani, K., Lee, S., Peña-Mora, F., Helmes, P., and Fulenwider, M., “Proactive Coordination to Reduce Structural Steel Delays,” 2007 ASCE Construction Research Congress, Grand Bahamas Island, May, 6-8, 2007.
41.
Han, S., Peña-Mora, F., Lee, S., and Park, M., “Strategic-Operational Project Management for Managing Non-Value Adding Iterations,” 2007 ASCE Construction Research Congress, Grand Bahamas Island, May, 6-8, 2007.
42.
Golparvar Fard, M., and Peña-Mora, F., “Automated Monitoring of Construction Progress Using Stereo-Vision Recognition Techniques,” 2007 ASCE Construction Research Congress, Grand Bahamas Island, May, 6-8. 2007.
43.
Menassa, C., and Peña Mora, F., “A System Dynamics Model to Evaluate the Impact of Uncertainty on ADR Investments in AEC Projects,” 2007 ASCE Construction Research Congress, Grand Bahamas Island, May, 6-8, 2007.
44.
Lee, S., and Peña-Mora, F., “Lessons Learned from Applying System Dynamics to Construction Simulation,” 13th EG-ICE Workshop, Ascona, Switzerland, 2006.
45.
Tsai, M.-H., Liu, L. Y., and Pena-Mora, F., “Designing Building Black-Boxes to Support Disaster Relief Efforts,” 19th International Conference on Computer Application in Industry and Engineering, CAINE, Las Vegas, NV, USA, November, 13-15, 2006.
46.
Aldunate, R., Koustoula, D., Peña-Mora, F., and Lakhera, S., "A Decentralized Trust Model to Reduce Information Unreliability in Complex Disaster Relief Operations," Lecture Notes in Computer Science, Vol. 4200, pp. 383-407, Springer Berlin /Heidelberg, 2006.
47.
Son, J., and Pena-Mora, F., “Improvement of Collaboration among First Responders Including Civil Engineers during Disaster Response in Urban Areas," 11th International Conference on Computing in Civil and Building Engineering, 2006 Joint International Conference on Computing and Decision Making in Civil and Building Engineering, ICCCB-XE, Montreal, Canada, June, 14-16, 2006.
48.
Menassa C., and Peña-Mora F., “An option based model for evaluating ADR investments in design and construction projects,” 11th International Conference on Computing in Civil and Building Engineering, 2006 Joint International Conference on Computing and Decision Making in Civil and Building Engineering, ICCCB-XE, Montreal, Canada, June, 14-16, 2006.
49.
Han, S., Peña-Mora, F., Lee, S., and Park, M., “Hybrid Strategic and Operational Project Management,” 11th International Conference on Computing in Civil and Building Engineering, 2006 Joint International Conference on Computing and Decision Making in Civil and Building Engineering, ICCCB-XE, Montreal, Canada, June, 14-16, 2006.
50.
Lee, S., and Peña-Mora, F., “Visualization of Construction Progress Monitoring,” 11th International Conference on Computing in Civil and Building Engineering, 2006 Joint International Conference on Computing and Decision Making in Civil and Building Engineering, ICCCB-XE, Montreal, Canada, June, 14-16, 2006.
51.
Lee, S., and Peña-Mora, F., “Latency in Error and Change Management,” 11th International Conference on Computing in Civil and Building Engineering, 2006 Joint International Conference on Computing and Decision Making in Civil and Building Engineering, ICCCB-XE, Montreal, Canada, June, 14-16, 2006.
52.
Lee, S., and Peña-Mora, F., “System Dynamics Approach for Error and Change Management in Concurrent Design and Construction,” 2005 Winter Simulation Conference, Institute of Electrical and Electronics Engineers (IEEE), Piscataway, NJ, USA, 2005.
53.
Han, S., Park, M., and Peña-Mora, F., "Comparative study of discrete-event simulation and system dynamics for construction process planning," ASCE Construction Research Congress, San Diego, CA, USA, April, 5-7, 2005.
54.
Lee, S., Peña-Mora, F., and Park, M., "Dynamic Error and Change Management in Concurrent Design and Construction," ASCE Construction Research Congress, San Diego ,CA, USA, April, 5-7, 2005.
55.
Aldunate, R., Nussbaum, M., and Pena-Mora, F., "An Empirical Wi-Fi Based Location Mechanism for Urban Search and Rescue Operations," Lecture Notes in Computer Science , Vol. 2957, pp. 48 - 61, Springer-Verlag, 2004.
56.
Lee, S., Peña-Mora, F., and Park, M., "Reliability and Stability Buffering Approach in Concurrent Design and Construction Projects," 11th Annual Conference, IGLC (International Group of Lean Construction), Blacksburg, VA, USA, July, 22-24, 2003.
57.
Lee, S., Peña-Mora, F., and Park, M., "The Impact of Dynamic Quality and Change Management on Performance in Large Scale Concurrent Construction Projects," Construction Congress Research Conference, ASCE, Hawaii, USA, March, 19-21, 2003. (Electronic book)
58.
Peña-Mora, F., Aldunate, R., and Nussbaum, M., "Availability Analysis of an Ad-Hoc DSMS for Disaster Relief Environments," In proceedings of the XII International Conference of the Chilean Computer Science Society (SCCC'02), IEEE press, Copiapó, Atacama, Chile, November, 06 - 08, 2002.
59.
Park, M., and Pena-Mora, F., "User-Defined Modeling Approach for the Dynamic Planning and Control of Construction Projects," ASCE Special Conference on Fully Integrated and Automated Project Processes in Civil Engineering , Blacksburg, VA, USA, ASCE Press, Redmond, VA, USA, January, 2002.
60.
Gupta, A., Vadhavkar, S., Peña-Mora, F., and Yeung, J., “An Integrated Framework to Support Distributed CAD over the Internet,” Enabling Technologies Infrastructure for Collaborative Enterprise, (WET ICE 01), IEEE Press, Cambridge, MA, USA, June, 2001.
61.
Park, M., and Peña-Mora, F., “Dynamic Planning and Control of Large Scale Infrastructure Projects,” ASCE/ICCCBE 2000 Conference in Computing in Civil and Building Engineering, Atlanta, GA, USA, ASCE Press, pp. 930-939, Redmond, VA, USA, August, 2000.
62.
Vadhavkar, S., and Peña-Mora, F., “Geographically Distributed Team Interaction Space,” ASCE/ICCCBE 2000 Conference in Computing in Civil and Building Engineering, Atlanta, GA, USA, ASCE Press, pp. 373-379, Redmond, VA, USA, August, 2000.
63.
Peña-Mora, F., Strumminger, R., Favela, J., and Losey, R., “Supporting a Real-World Project-based, Technology Supported Collaborative Distance Learning Environment,” ASCE/ICCCBE 2000 Conference in Computing in Civil and Building Engineering, Atlanta, GA, USA, ASCE Press, pp. 170-176, Redmond, VA, USA, August, 2000.
64.
Soibelman, L., and Peña-Mora, F., "M-RAM: An Artificial Intelligence Distributed System to Support the Conceptual Phase of Structural Design," Civil-Comp99-The Seventh International Conference on Civil and Structural Engineering Computing, pp.13-15, Oxford, England, September, 1999.
65.
Peña-Mora, F., “Collaborative Negotiation for Large Scale Civil Engineering Projects," International Meeting on Artificial Intelligence in Structural Engineering, pp. 271-294, Ascona, Switzerland, July, 1998.
66.
Peña-Mora, F., “Adaptive Retrieval and Presentation of Engineering Information,'' Computing in Civil Engineering, ASCE International Computing Congress, Boston, MA, USA, ASCE Press, pp. 181-188, Redmond, VA, USA, October, 1998.
67.
Peña-Mora, F., and Ali-Ahmad, W., “Adaptive Retrieval and Presentation of Information in Preference-Influenced Collaborative Environments,” Artificial Intelligence in Design ‘96, Lisbon, Portugal, Kluwer Academic Publishers, pp. 619-639, London, England, July, 1998.
68.
Peña-Mora, F., Field, R., and Gabrielsson, A., “The Dynamic Agenda Planner Tool – Meeting the Collaborative Engineering Demands of the Future,” Conference on Concurrent Engineering in Construction, pp. 241-249, London, UK, July, 1997.
69.
Shelden, D., Connor, J., Williams, J., and Peña-Mora, F., “The Collaborative Design Studio at MIT,” ASCE Fourth Congress on Computing in Civil Engineering, Philadelphia, PA, USA, ASCE Press, pp. 403-410, Redmond, VA, USA, June, 1997.
70.
Peña-Mora, F., and Hong, C., “Schedule Analysis and Recovery System,” ASCE Fourth Congress on Computing in Civil Engineering, Philadelphia, PA, USA, ASCE Press, pp. 17-24, Redmond, VA, USA, June, 1997.
71.
Peña-Mora, F., and Hussein, K., "Change Negotiation Meetings in a Distributed Collaborative Engineering Environment,” Information Representation and Delivery in Civil and Structural Engineering Design, Glasgow, UK, Civil-Comp Press, pp. 29-38, Edinburgh, United Kingdom, August, 1996.
72.
Peña-Mora, F., and Vadhavkar, S., “Design Rationale and Design Patterns in Reusable Software Design,” Artificial Intelligence in Design ‘96, Stanford, CA, USA, Kluwer Academic Publishers, pp. 251-268, London, England, July, 1996.
73.
Peña-Mora, F., and Soibelman, L., “A Geographically Distributed Multi-Reasoning Mechanism for Change Negotiation Management of Large-Scale Engineering Systems,” Construction on the Information Highway, Bled, Slovenia, CIB Proceedings Publication 198, W78 Working Commission on Information Technology in Construction and TG10 Task Group on Computer Representation of Design Standards and Building Codes, pp. 409-422, June, 1996.
74.
Peña-Mora, F., and Hong, C., "Information Technology for Better Management of Change Cost and Schedule in Construction Projects,” ASCE Third Congress on Computing in Civil Engineering, Anaheim, CA, USA, ASCE Press, pp. 613-619, Redmond, VA, USA, June, 1996.
75.
Peña-Mora, F., and Kennedy, J., "Theoretical Foundations for Computer Supported Negotiation,” ASCE Third Congress on Computing in Civil Engineering, Anaheim, CA, USA, ASCE Press, pp. 186-192, Redmond, VA, USA, June, 1996.
76.
Peña, F., Logcher, R. and Mine, N., “Proactive Project Control through an Object-Oriented Database Management System,” ASCE Second Congress on Computing in Civil Engineering, Atlanta, GA, USA, ASCE Press, pp. 696-703, Redmond, VA, USA, June, 1995.
77.
Peña-Mora, F., Sriram, D., and Logcher, R., “Active Computer Support for Design Rationale Capture,” ASCE Second Congress on Computing in Civil Engineering, Atlanta, GA, USA, ASCE Press, pp. 1453-1460, Redmond, VA, USA, June, 1995.
78.
Peña-Mora, F., "Change Management for Computer Supported Collaborative Design/Manufacturing/Repair," NSF Strategic Planning Workshop for Design Engineering, Phoenix, AZ, USA, May, 1995.
79.
Hussein, K., Peña-Mora, F., and Sriram, D., “CAIRO: A System for Facilitating Communication in a Distributed Collaborative Engineering Environment,” Proceedings Enabling Technologies Infrastructure for Collaborative Enterprise, Berkeley Spring, WV, USA, IEEE Press, pp. 154-162, April, 1995.
80.
Ford, D., and Peña-Mora, F., "The Design of a Proactive Cost Feedback System for Construction Project Management," ASCE First Congress on Computing in Civil Engineering, Washington, DC, USA, ASCE Press, pp. 1365-1372, New York, NY, USA, June, 1994.
81.
Peña-Mora, F., Logcher, R., Mine, N., and McManus, T., "SCHEREC: SCHedule RECovery system,'' ASCE First Congress on Computing in Civil Engineering, Washington, DC, USA, ASCE Press, pp. 17-24, New York, NY, USA, June, 1994.
82.
Peña-Mora, F., Sriram, D., and Logcher, R., "Conflict Management Using SHARED-DRIMS,'' ASCE First Congress on Computing in Civil Engineering, Washington, DC, USA, ASCE Press, pp. 1599-1606, New York, NY, USA, June, 1994.
83.
Peña-Mora, F., Sriram, D., and Logcher, R., "SHARED-DRIMS: A Proactive Project Management System for Conflict Management,’’ IJCAI-93 Workshop on Computational Models of Conflict Management in Cooperative Problem Solving, June, 1993.
84.
Peña-Mora, F., Sriram, D., and Logcher, R., "SHARED-DRIMS: SHARED Design Recommendation-Intent Management System,” Proceedings Enabling Technologies Infrastructure for Collaborative Enterprise, IEEE Press pp. 213-22, Morgantown, WV, USA, April, 1993.
 

 

 

© copyright 2010 Feniosky Peña-Mora